(The above prices do not include sales tax. Note: Mat = Materials, Equip = Equipment)
* Board reserves the right to require multiple taps for 1 1/2-inch and 2-inch.
If a tapping saddle is required, the cost and sales tax of tapping saddle shall be added to the above fees. If this cost difference is critical to bid proposals, it is recommended that the size of water main to be tapped be checked before a project is estimated.
II. 1 1/2-inch and 2-inch single corp taps with saddles *
Tap
$Mat
$Labor
$Equip
$Total
4" x 1 1/2"
176
161
81
418
6" x 1 1/2"
229
161
81
471
8" x 1 1/2"
242
161
81
484
12"x 1 1/2"
301
161
81
543
16"x 1 1/2"
367
161
81
609
4" x 2"
222
161
82
465
6" x 2"
275
161
82
518
8" x 2"
288
161
82
531
12" x 2"
347
161
82
590
16" x 2"
413
161
82
656
(The above prices do not include sales tax. Note: Mat = Materials, Equip = Equipment)
* Board reserves the right to require multiple taps for 1 1/2-inch and 2-inch.
Any tap price shown above must be obtained through Board Service Department
III. 4-inch and larger: Asbestos-Cement (Transite)
Tap
$Mat
$Labor
$Equip
$Total
6" x 4"
728
312
176
1,216
6" x 6"
1,040
312
176
1,528
8" x 4"
744
312
176
1,232
8" x 6"
859
312
176
1,347
8" x 8"
1,407
312
176
1,895
12" x 4"
751
312
176
1,239
12" x 6"
904
312
176
1,392
12" x 8"
1,210
312
176
1,698
12" x 12"
2,358
312
176
2,846
16" x 4"
787
312
176
1,275
16" x 6"
916
312
176
1,404
16" x 8"
1,317
312
176
1.805
16" x 12"
2,140
312
176
2,628
(The above prices do not include sales tax. Note: Mat = Materials, Equip = Equipment)
IV. 4-inch and larger: Cast Iron or PVC
Tap
$Mat
$Labor
$Equip
$Total
6" x 4"
728
312
176
1,216
6" x 6"
837
312
176
1,325
8" x 4"
740
312
176
1,228
8" x 6"
986
312
176
1,474
8" x 8"
1,146
312
176
1,634
10" x 4"
761
312
176
1.249
10" x 6"
887
312
176
1,375
10" x 8"
1,217
312
176
1,705
12" x 4"
763
312
176
1,251
12" x 6"
922
312
176
1,410
12" x 8"
1,345
312
176
1,833
12" x 12"
2,080
312
176
2,568
16" x 4"
787
312
176
1,275
16" x 6"
916
312
176
1,404
16" x 8"
1,279
312
176
1,767
16" x 12"
2,140
312
176
2,628
(The above prices do not include sales tax. Note: Mat = Materials, Equip = Equipment)
Any tap price not shown above must be obtained through Board Service Department.
V. Tapped couplings and tees: When provided by a customer, a charge of $100 shall apply.
VI. Notes:
A. All excavations, concrete thrust blocks, backfill, resurfacing, and permits are the responsibility of the contractor/owner.
B. See Board Rules and Regulations, Section 6, for complete explanation of taps, tap couplings, and tees.
C. Any questions regarding which cost pertains to a particular property or situation should be referred to the Board Service Department, 543-2217.
D. When abandoning old water services and corporations at the main, the Board Service Department must be notified. The Service Department will dispatch a water service representative to witness shutoff at the water main while excavation is still open. See Sections 6.06 and 7.03.